Project Description

  • Construction of Mezzanine / Office Fit out, 400m2 within existing warehouse unit
  • Steel framed mezzanine with steel staircase, and plasterboard & glass exterior walls
  • Complete office fit out including office, meeting room, kitchen, amenities
  • Bright colours compliment timber finishes with a smart and modern architectural design
  • Addition of skylights creating a bright office connected to the outside world
  • This project required a WHS Management Plan which was maintained throughout the project
  • Key aspects of safety included strict controls in external carpark area / traffic control, heavy lifting equipment for steel structure and, working at heights.
  • Regular site safety checks were performed along with staff inductions and regular tool box talks
  • Waste materials were recycled where possible or disposed of accordingly at recognised waste control facilities